  1. Contractor Site Supervision and Its Role in Mitigating Construction Delays in Kuala Lumpur

     Wilgene Chung, Zetty Pakir Mastan, Kok Ching Wen, Nga Elsie, Dr. Samad Sepasgozarp

    Paper ID IS-STEMDUBLN-011026-100 Pages 1-6

    Show abstract

    Construction delays remain a critical challenge in Malaysia's building industry, contributing to cost overruns, quality deficiencies, stakeholder dissatisfaction, and inefficient project delivery. Inadequate contractor site supervision can exacerbate these challenges by affecting on-site coordination, resource management, quality control, and contractual compliance. This study investigates the role of contractor site supervision in mitigating construction delays in Malaysian building projects. Specifically, it examines supervision-related delay factors, evaluates supervisory roles and responsibilities under the PAM Contract 2018, and assesses the contribution of effective supervision to improved coordination and timely project completion. A quantitative research approach was adopted using structured questionnaires distributed to professionals from Grade 7 (G7) contractor organisations in Kuala Lumpur. Data collected through Google Forms were analysed using descriptive statistical methods and the Relative Importance Index (RII) to identify key trends and patterns. The findings reveal that inadequate daily monitoring (RII: 0.896), poor subcontractor coordination (RII: 0.804), and underqualified supervisors (RII: 0.798) are the most critical supervision-related causes of delays. A significant implementation gap exists between contractual duties under PAM 2018 and on-site practices, with limited authority in decision-making (RII: 0.867) identified as the foremost challenge. The study proposes practical strategies including digital tool adoption, continuous professional training, and stronger contractual enforcement. The findings provide empirical insights and practical recommendations for strengthening contractor site supervision, improving project delivery performance, and supporting more efficient and sustainable construction practices in Malaysia. Keywords - Construction delays, Contractor site supervision, PAM Contract 2018, Delay mitigation, Kuala Lumpur, Building projects.